建筑施工的要求

第1篇

关键词:外墙保温;节能;施工工艺;

abstract : along with the continuous development of science and technology level, at present our country a lot of high efficiency and energy saving products has obtained the good application in construction projects, some of the more traditional construction technology has also been a larger reform. In our country, in the process of construction, the building's exterior wall thermal insulation technology has gradually developed mature, and also played a good heat insulation effect, which to a certain extent, reduce the interior energy consumption, has played a function of energy conservation and environmental protection. This article mainly analyzes the current construction of exterior wall thermal insulation engineering construction technology, and has carried on the detailed analysis of its technology, hoping to provide certain reference value for related construction enterprises.

Key words: exterior wall thermal insulation; Energy saving; The construction technology;

中图分类号:TS958.1+7 文献标识码:A 文章编号:

随着我国近几年来可持续发展理论的不断加深,在一定程度上也促使了我国建筑行业的节能环保的相应工作的开展,并且建筑工程施工中也相应的应用了各种新型材料,环保节能材料。近几年来,我国建筑行业在建筑物外墙保温节能技术方面有了较为深入的研究,并已经取得了一定的成效,但是就建筑物外墙保温材料的质量方面上还需要一定的研究以及改革,这就在一定程度上对技术研发部门提出了较高的要求,在不断地摸索和研究中找到外墙材料相对透气性好、抗负风压能力强、适应范围更广的建筑施工保温材料,从而能够进一步完善施工技艺,提高外墙保温性能。

一、关于外墙保温工程施工技术

1、相关注意事项

首先,外墙保温工程要在房子和门窗建好之后方可开始施工,施工时要避开过冷过热的季节,这是因为气温太低或太高会影响保温材料的伸缩性;高温会影响保温材料的抗老化性,使保温板发霉,低温又会使软化系数发生变化,造成冻胀现象使部分保温材料脱落,进而使得整个保温系统瘫痪。为了防止坏天气对保温墙体的影响,大风和雨天最好不要施工。

其次,门窗周边,阳台,檐口,穿墙管线洞口等要密封完好,以防漏水。由于山墙面积比较大,温度变化也比较大,因此应设置适当的变形缝。不同材料的交接处也应设置变形缝。最后同样重要的是施工时必须保持电、水的充分供应,为了确保施工人员的安全,保护设施一定要具备齐全,尽量营造良好的施工环境。

2、关于外墙保温工程的施工技术处理方法

在具体的外墙保温工程施工中,首先需要将施工中所要用到的脚手架搭设完毕,经质量验收后方可进行基层处理和后续施工,在基层整理完成后,保证其平整清洁,然后再利用配制完成的砂浆将粘结聚苯板粘贴在基层上。

2.1 关于基层处理技术

要想能够最大程度上保证外墙保温工程能够顺利的进行,施工人员就必须对基层墙体进行相关的清理工作,保证墙体的干净,以及墙面没有其他的污染物或者其他能够防碍粘贴物的材料,这样才能够在一定程度上保证外墙保温材料能够较好的于墙体服帖。不仅仅如此,施工人员还应当及时的对基层墙中间松动或者风化等部分进行相应的清除工作,在完成清除的工作之后,施工人员再使用水泥砂浆填充找平。在建筑物的基层墙体的表面不够平整,使得墙体不能够达到相关设计要求的时候,施工人员可以按照设计说明用水泥砂浆对墙体进行找平。

2.2 关于粘结聚苯板的使用

施工人员应该根据设计图的要求,在经过平整处理的外墙上沿着散水表格用墨线弹出散水及其勒角水平线,这样能够在一定程度上保证施工的平整。当建筑物施工需要设置系统变形缝的时候,施工人员应当在墙面相应的位置弹出变形缝及其宽度线,标出聚苯板的粘接位置,这样能够在一定程度上保证施工的顺利进行。

3、关于建筑物外墙保温技术分析

建筑墙体保温技术有内保温、外保温和夹心保温之分。不同的保温层起到的相应的效果也是不一样的,外保温可以改善室内居住环境,提高墙体隔热保温性能,与内保温相比,技术含量更高,而且还能够在一定程度上增大室内住房面积,并且还能够加强建筑物墙体的防潮性能,同时还可以在一定程度上避免室内建筑材料发霉、滴水的现象的发生,延长了保温材料的使用寿命。外保温的适用范围更广,不仅可以用于新建建筑,还可以用于空调建筑、采暖建筑、旧房的节能改造等。

建筑物墙体外保温可以避免产生一定的热量。根据相关的数据调查显示,在采用相同厚度的保温材料情况下,外保温要比内保温的热损失减少约五分之一,这就使得建筑物墙体能够在一定程度上减少了能量的消耗。

当建筑物采用了外保温的施工工艺的情况下,内部的砖墙或混凝土墙就能够受到一定的保护,室外气候发生的不断变化,从而使得引起墙体内部发生较大的温度变化的现象产生在外保温层内,这样就能够使内部的主体墙在冬季温度提高,并且能够在一定程度上降低湿度,通过这种外保温的施工工艺,从而使得室内的温度变化较为缓慢,并且能够减少热应力,这就会大大降低主体墙产生裂缝、变形、破损的概率,并且会加强建筑物墙体以及外墙保温材料的寿命。

二、关于外墙外保温施工具体方法分析

1、关于外挂式外保温技术方法

在施工中,一般施工单采用外挂的保温材料有岩(矿)棉、玻璃棉毡、聚苯乙烯泡沫板、陶粒混凝土复合聚苯仿石装饰保温板、钢丝网架夹芯墙板等。其中就外墙材料中聚苯板因具有优良的物理性能和成本较低,从而促使了聚苯板的保温材料在外墙保温外挂施工工艺当中的广泛使用。施工工人在使用外挂技术的时候,主要是通过粘接砂浆或者是一些专用的固定件将保温材料贴、挂在外墙上,然后施工工人再抹抗裂砂浆,压入玻璃纤维网格布形成保护层,最后加做建筑物外墙的装饰面。还有另外一种施工工艺是用专用的固定件将不易吸水的各种保温板固定在外墙上,然后施工人员将天然石材、彩色玻璃等外挂在预先制作的龙骨上,直接形成装饰面,这种施工方法操作简便,并且施工所需要的工期较短。

2、关于一次成型技术方法

建筑施工企业在采用聚苯板与墙体一次成型技术的时候,主要是施工工人在混凝土框-剪体系中将聚苯板内置于建筑模板内,在即将浇注的墙体外侧浇注混凝土,使得混凝土与聚苯板一次浇注成型为复合墙体。这种施工技术具有较为明显的优势,因为其解决了关于外挂式外保温的主要问题。主要是因为这种施工工艺的特殊性,使得外墙主体与保温层一次成活,这就会大大提高了施工的效率,并且缩短了施工工期。在施工的过程中,施工工人将单面钢丝网聚苯板与混凝土进行相应的连接,并且主要依靠混凝土与聚苯板的粘接力以及斜插钢筋、L 型钢等与混凝土墙体的锚固力,大大提高了钢筋于混凝土墙体之间的结合性能,这样还能够在一定程度上使得施工人员的安全性能够得到较大的保障。而且在冬季施工时,利用聚苯板起保温的作用,可以在一定程度上大大降低围护保温措施。但在施工人员在浇注混凝土时要注意均匀、连续浇注,否则由于混凝土侧压力的影响会造成聚苯板在拆模后出现变形和错茬,影响后序施工。

三、结束语

我国建筑外墙保温技术的大量应用于建筑施工当中,在一定程度上降低了建筑能源的消耗水平,同时也起到了一定的节能环保的作用,为我国建筑施工行业的可持续发展道路起到了较为重要的作用。相关建筑施工企业应当大力支持外墙保温技术的应用,从而能够进一步的对外墙保温材料的推广应用,并且技术部门也应当加强对于外墙保温技术以及材料的改革,从而能够更为科学的提高建筑物外墙材料的保温效果,为我国建筑行业的可持续发展做出相应的贡献。

参考文献:

第2篇

现场施工可以发现,混凝土质量的好坏,主要取决于混凝土的流动性、黏聚性、保水性这三个方面,因此,我们要从这三个方面采取措施。

施工中容易发生的混凝土质量问题

在施工当中我们可以看到或参与一些混凝土浇筑作业,如隐蔽工程(钻孔灌注桩)、桩问系梁(承台)、墩柱、盖梁以及主体混凝土作业,通常采用的一般是现浇法施工。在施工当中,无论是采用哪一种浇筑工艺,都必须保证混凝土的工作性。然而我们经常发现一些问题,如混凝土浇筑时,混凝土出现流动性较大或较小的问题。当流动性较大时,部分责任心不强的施工人员会在现场监督人员不注意的情况下直接进行浇筑影响施工质量:流动性较小时,部分施工人员会采取在混凝土运输车搅拌罐里面加水的措施,便于振捣或浇筑,同样会影响施工效果。对于这种情况,现场管理人员要及时制止,因为这些做法严重影响了混凝土的正常的工作特性,往往会造成混凝土分层、泌水,甚至发生离析现象,从而造成工程经济损失或出现工程质量问题,对于现场施工,特别要注意一些隐蔽工程的混凝土浇筑工作,更应严格控制其混凝土工作特性,从而保证施工质量。

凝凝土质量问题的产生现象和原因

水灰比不合适。在固定的用水量的条件下,水灰比小(水泥用量多)时,会使水泥浆变稠,拌合物流动性较小;若加大水灰比(减小水泥用量),可使水泥浆变稀,流动性增大,但会使拌合物流浆、离析,影响混凝土的强度,必须配备合理的水灰比。

水泥浆的数量不合适。混凝土拌合物中的水泥浆,除了填充集料间的空隙外,包裹在集料表面并略有富余,使拌合物有一定的流动性。在水灰比一定的条件下,水泥浆越多,流动性越大,但如水泥浆过多,集料则相对减少,将出现流浆现象,拌合物的稳定性较差,不仅浪费水泥,而且会使拌合物的强度和耐久性降低;若水泥浆用量过少,则无法很好的包裹集料表面及填充其空隙,拌合物宜产生崩塌现象,失去稳定性,因此,拌合物中的水泥浆数量应满足流动性为宜。

水量过多。实践证明,对塌落度影响最大的因素还是单位用水量。增加用水量,流动性增大,但硬化后混凝土会产生较大的孔隙,从而降低了混凝土的强度和耐久性。另外用水量过多,会使混凝土产生分层、泌水现象,反而降低工作性。因此,在保证混凝土强度和耐久性的条件下,应根据混凝土流动性来确定单位用水量。

砂子比率。砂率反应了粗细集料的相对比例,它允许混凝土骨料的空隙和总面积。当水泥浆用量一定时,砂率过大,则集料的总表面积增大,包裹砂子的水泥浆层变薄,砂粒间的摩擦阻力加大,拌合物的流动性减小;砂率过小,虽然表面积减小,但由于砂浆量不足,水泥浆除填充石子空隙外,包裹在石子表面的水泥砂浆层变薄,拌合物的流动性变小,同时由于砂量不足,也宜导致离析、泌水等现象,影响工作性。因此,砂率有一个合理值。在水泥浆用量一定时,能使混凝土获得最大的流动性,又不离析、不泌水时的砂率,即合理砂率。

水泥的品种和集料的性质。水泥品种不同,达到标准时的用水量不同,在其他条件相同的情况下,标准稠度用水量最小的水泥,其混凝土拌合物的流动性较大。通常普通水泥的混凝土拌合物比矿渣水泥和火山灰水泥的工作性好。矿渣水泥拌合物的流动性虽大,但黏聚性差,宜泌水、离析。火山灰水泥流动性小,但黏聚性最好。在相同用水量的条件下,集料表面光滑、形状较圆、少棱角的卵石,所拌制的混合料流动性大,但强度较表面粗糙、有棱角的碎石低。

其它因素。包括在混凝土拌合物中加入某些外加剂,可在不增加用水量和水泥用量的情况下,有效的改善混凝土拌合物的工作行。还有温度与搅拌时间的影Ⅱ向。温度越高,混凝土拌合物的水分蒸发越快,流动性越小,温度升高10℃塌落度大约减小20—40mm,夏季施工时必须注意这一点。另外搅拌时间长短,也会影响混凝土拌合物的工作性,若搅拌时间不足,拌合物的工作行就越差,质量也不均匀。所以规范规定最小搅拌时间为1~3分钟。

改善混凝土质量的技术要点

适度使用添加剂,使混凝土拌合物的工作性符合不同的使用要求。

有效调节混凝土的构成比例。在保证混凝土强度、耐久性和经济性的前提下,适当调整混凝土配合比以提高工作性。

提高振捣机械的效能。由于振捣效能的提高,可降低施工条件对混凝土拌合物的要求。

结论和建议

第3篇

关键词:高层建筑;沉降观测;基本要求

1 高层建筑的定义

高层建筑,超过一定高度和层数的多层建筑。在美国,24.6m或7层以上视为高层建筑;在日本,31m或8层及以上视为高层建筑;在英国,把等于或大于24.3m得建筑视为高层建筑。中国自2005年起规定超过10层的住宅建筑和超过24米高的公共建筑及综合性建筑为高层建筑[1]。但是,超过24米的单层建筑不算高层建筑。1972年国际高层建筑会议将高层建筑分为4类:第一类为9~16层(最高50米),第二类为17~25层(最高75米),第三类为26~40层(最高100米),第四类为40层以上(高于100米)。中国《民用建筑设计通则》(GB 50352-2005)将住宅建筑依层数划分为:一层至三层为低层住宅,四层至六层为多层住宅,七层至九层为中高层住宅,十层及十层以上为高层住宅。建筑高度的计算:当为坡屋面时,应为建筑物室外设计地面到其檐口的高度;当为平屋面(包括有女儿墙的平屋面)时,应为建筑物室外设计地面到其屋面面层的高度;当同一座建筑物有多种屋面形式时,建筑高度应按上述方法分别计算后取其中最大值。局部突出屋顶的嘹望塔、冷却塔、水箱间、微波天线间或设施、电梯机房、排风和排烟机房以及楼梯出口小间等,可不计入建筑高度内。

2 高层建筑工程施工中沉降观测的基本要求

2.1 沉降观测

沉降观测(settlement observation):对被观测物体的高程变化所进行的测量。随着工业与民用建筑业的发展,各种复杂而大型的工程建筑物日益增多,工程建筑物的兴建,改变了地面原有的状态,并且对于建筑物的地基施加了一定的压力,这就必然会引起地基及周围地层的变形。为了保证建(构)筑物的正常使用寿命和建(构)筑物的安全性,并为以后的勘察设计施工提供可靠的资料及相应的沉降参数,建(构)筑物沉降观测的必要性和重要性愈加明显。现行规范也规定,高层建筑物、高耸构筑物、重要古建筑物及连续生产设施基础、动力设备基础、滑坡监测等均要进行沉降观测。特别在高层建筑物施工过程中,应用沉降观测加强过程监控,指导合理的施工工序,预防在施工过程中出现不均匀沉降,及时反馈信息,为勘察设计施工部门提供详尽的一手资料,避免因沉降原因造成建筑物主体结构的破坏或产生影响结构使用功能的裂缝,造成巨大的经济损失。沉降观测应根据建筑物设置的观测点与固定(永久性水准点)的测点进行观测,测其沉降程度用数据表达,凡三层以上建筑、构筑物设计要求设置观测点,人工、土地基(砂基础)等,均应设置沉陷观测,施工中应按期或按层进度进行观测和记录直至竣工。

2.2 沉降观测的基本要求

2.2.1 仪器设备、人员素质要求

建筑物随着楼层的不断增高,负荷也在不断增大。对于沉降的观测精度要求比较高,为了能够精确地反应出建筑物的沉降情况,我们对于仪器的选择也是要求比较高的。我们规定测量的误差应该小于形变值的1/10-1/20,水准尺我们最好选择锱合金水准尺,它对于环境和温度的变化受到的影响比较小,如果我们选择塔尺,应该使用第一段标尺。我们对于观测人员也是有严格要求的:必须能够熟练使用仪器,有经过专业的培训,能够根据不同工程的特点,不同的具体情况灵活的选择观测方法。

2.2.2 观测时间的要求

建(构)筑物的沉降观测对时间有严格的限制条件,特别是首次观测必须按时进行,否则沉降观测得不到原始数据,而是整个观测得不到完整的观测意义。其他各阶段的复测,根据工程进展情况必须定时进行,不得漏测或补测。只有这样才能得到准确的沉降情况或规律。相邻的两次时间间隔称为一个观测周期,一般高层建筑物的沉降观测按一定的时间段为一个观测周期(如:次/30天)或按建筑物的加荷情况,每升高一层(或数层)为一观测周期,无论采取何种方式都必须按施测方案中规定的观测周期准时进行。

2.2.3 观测点要求

观测点的选择直接影响建筑物的沉降情况,所以我们要选择最能反映沉降特点的位置作为观测点。通常我们会把建筑物纵向和横向的对称点,作为观测点,相邻点之间的距离一般规定为15-30之间,这些点的选择要确保均匀的分布在建筑物周围。一般情况下,在图纸上会标明专门的观测点,我们要严格按照图纸进行。在此之外,我们还要考虑各施工阶段对于观测要求,尤其是在装饰阶段,墙或柱子的装饰面是否会挡住观测点,从而不能连续观测而失去观测的意义。

2.2.4 沉降观测的自始至终要遵循“五定”原则

所谓“五定”,即通常所说的沉降观测依据的基准点、工作基点和被观测物上的沉降观测点,点位要稳定;所用仪器、设备要稳定;观测人员要稳定;观测时的环境条件基本一致;观测路线、镜位、程序和方法要固定。以上措施在客观上尽量减少观测误差的不定性,使所测的结果具有统一的趋向性,保证各次复测结果与首次观测的结果可比性更一致,使所观测的沉降量更真实。

2.2.5 沉降观测的次数和时间

沉降观测的次数和时间,应按设计要求,一般第一次观测应在观测点安设稳固后及时进行。民用建筑每加高一层应观测一次,工业建筑应在不同荷载阶段分别进行观测;施工单位在施工期内进行的沉降观测,不得少于4次。建筑物和构筑物全部竣工后的观测次数,第一年4次,第二年2次,第三年后每年1次,至下沉稳定(由沉降与时间的关系曲线判定)为止。观测期限一般为:砂土地基2年,粘性土地基5年,软土地基10年。当建筑物和构筑物突然发生大量沉降、不均匀沉降或严重的裂缝时,应立即进行逐日或几天1次的连续观测,同时应对裂缝进行观测。

2.2.6 沉淀观测精度要求

根据建筑物的特性和建设、设计单位的要求选择沉降观测精度的等级。在没有特别要求的情况下,在一般性的高层建构筑物施工过程中,采用二等水准测量的观测方法就能满足沉降观测的要求。各项观测指标要求如下:第一,往返较差、附和或环线闭合差:h=∑a-∑b≤1.0,n表示测站数;第二,前后视距≤30m;第三,前后视距差≤1.0m;第四,前后视距累积差≤3.0m;第五,沉降观测点相对于后视点的高差容差:≤1.0mm。

3 结束语

沉降观测的时候,要严格根据测量基本要求进行实测,在前后观测的时候要选择同一把尺子,避免尺子的不同造成误差;每次观测都要按照固定的观测路线进行,不能随意更改;在观测的时候要确保每次观测的环境基本一致;如果建筑物的沉降每天发生变化,要及时向有关部门反馈,采取相应措施。只有切实做好高层建筑物的沉降情况,才能确保工程的顺利进行,才能够创造更多的社会效益和经济效益。

参考文献

第4篇

【关键词】土建工程;预埋件;施工技术要点

预埋件是土建工程隐蔽工序中的一种结构构件,起到十分重要的固定作用。预埋件是在结构中留设由钢板和锚固筋的构件,起到用来连接结构构件或非结构构件的固定用途。可分为受力预埋件和构造预埋件两种,主要区别就是一个是承受荷载,一个是按照构造要求设置安装。通常情况下,预埋件可以是埋设在混凝土内部的锚筋,也可以是在混凝土表面的锚板。预埋件作为结构连接的组成部分,是保证工程结构在任何工况下稳定性的重要部分。因此,它的施工质量直接影响着土建工程的施工质量和结构安全。所以在土建工程施工中,必须抓住预埋件施工的技术要点,做好质量控制工作。

1 预埋件施工方案

针对本工程的具体情况,积极与总包单位技术部门交流,掌握施工重点、难点的处理,在结合我司的施工组织计划,制定出合理的预埋件施工计划,包括材料计划、劳动力组织、机械设备计划、施工工序安排、施工段划分、进度与跟踪、质量保证措施等。

1.1焊接方式

在对预埋件进行焊接中一定要采用埋弧焊接,在焊接过程中引弧、维弧以及顶压环节是需要紧密配合的,焊接过程中及时的清理电板钳口杂质,及时的修复电极槽口的形状,如果在焊接过程中发现钢筋咬边或者钢板焊穿等问题,一定要及时的查明原因,清除焊接的缺陷,如果施工过程中是采用手工焊接的方式,贴角焊缝的高度一定要符合要求,当采用穿孔焊接时,钢板的焊接洞应该做成喇叭口,内部的直径一定要比钢筋的直径大约4毫米左右,倾斜角度大概为45°,焊接别要注意的是控制焊接的电流量,这样可以防止对钢筋的烧伤。

1.2调整偏差

根据现场的尺寸,结合幕墙的分格,求出偏差每分格内平均值,如未超出规范允许范围内的偏差,则根据现场尺寸分格埋设,如超出规范允许偏差,则必须及时组织包括设计师、业主工程师在内的小组,进行修正方案讨论和确定。

2 预埋件施工过程的固定方式

施工过程中固定预埋件是预埋件施工过程中非常重要的一个环节,关系着预埋件在今后施工中的质量问题。在预埋件施工过程中由于预埋件的位置不同,所以需要使用的固定方式也是不同的,预埋件的位置是处于现浇砼的表面上、以及砼的侧面,所以根据预埋件的大小不同和应用功能的不同通过以下几种固定方式进行固定。

2.1预埋件浇灌在砼的表面上

平板型的预埋件的尺寸非常的小,可以将预埋件直接通过扎绑的方式固定在主筋上,在浇灌的过程中,一定要随时的观察浇灌的位置情况,避免出现给以后的施工带来麻烦。角钢预埋件的固定方式也可以直接扎绑在主筋上,但是为了避免预埋件下的砼振捣不密实,在角钢预埋件固定之前一定要先在预埋件上钻一些洞,供砼在施工时能够及时的排气。对于施工面积相对比较大的预埋件施工过程中,除了运用锚筋固定外,一定要在锚筋上部分,点焊适当规格的角钢,这样可以防止预埋件位置发生偏移。

2.2预埋件浇灌在砼的侧面上

预埋件浇灌在侧面上时,因为砼浇灌在表面的面积比较小,所以要运用螺栓紧固卡子,让预埋件可以贴紧模板,还可以利用普通铁钉或者木螺丝放在之前在预埋件打好的孔上面。当预埋件的面积比较大的时,可以利用预埋件的内侧焊接螺帽,然后穿过板和模板与螺帽连接并固定。预埋件的固定位置要求一定不要与主筋相对碰。这样会使预埋件的位置发生偏差不符合固定,在设置预埋件时,预埋件不应该突出浇灌有砼的地方,在预埋件的表面上也不应该大于构件的外形尺寸。

2 预埋件施工工艺流程及准备工作

在预埋件施工前,应该首先了解预埋件的型式、位置、数量,然后根据图纸要求制作合适的预埋件。

2.1 工艺流程

熟悉图纸要求备料钢筋、钢板下料加工焊接安放预埋件(支模)按图纸校对预埋件尺寸、位置浇注混凝土养护、拆模检查预埋件施工质量修补处理。

2.2 准备工作

预埋件在制作加工前,需要对原材料的质量进行检验,主要检查这些材料是否具有出厂合格证,并对外观进行检查,看是否有缺陷、锈蚀等质量问题。因为这些预埋件可能作为受力构件,因此在使用前需要对他们进行必要的力学性能复验及化学成分分析。

当预埋件下料完成后,就可以进行预埋件焊接了,在焊接前,需要对钢筋的数量、品种等进行检查,看是否满足设计和国家规范要求,如钢板厚度应该大于0.6倍的钢筋直径,构造锚筋直径不小于6mm,受力锚筋直径不小于8mm,不得使用冷加工钢筋代替普通钢筋等,如果有不符合要求的情况,一定要查明原因,妥善解决,才能进行焊接工作。 对于钢筋焊接过程,首先应该选着合适的焊条和焊剂,因为这是影响到钢筋焊接质量的主要因素。因此,在焊接过程中,应该根据其使用要求和不同性能正确的选择焊条。当采用手工焊接时,如果锚筋与锚板的强度不同,应该根据强度较低的主题金属选用焊条的型号;当锚板采用3号钢板时,焊条可以采用T422-T425。预埋件的焊缝形式主要由锚筋的尺寸确定,其中锚筋的直径尽量不要超过20mm,并且优先选用压力埋弧焊,当施工条件受到限制时,可以采用电弧焊,应尽可能的次啊用塞焊。

3 保护施工中的预埋件

在预埋件的施工过程中,为了保证建筑工程的建筑质量和施工要求,预埋件施工之后我们要及时的进行养护,在砼的浇筑过程中,振动器必须避免与预埋件直接进行接触,在预埋件附近施工时,必须小心谨慎,一边施工、一边观察预买件,如果发生偏移,一定要及时的对预埋件进行校正,保证预埋件的位置不发生太大的变化。例如:在预埋件在施工中发生了质量情况以及紧急情况,我们通过接桩法、补桩法、钻孔补强法几种方式对预埋件进行修复和补救:

接桩法的运用情况时当桩后桩顶标高不足时,采用接桩法进行处理,可以通过开挖接桩挖出桩头,凿掉混凝土以及松散层,漏出钢筋位置,然后进行将位置进行整理和冲洗,最后在将钢筋接长,浇灌混凝土一直到符合设计标准位置,在接桩法中还可以通过嵌入式的接桩来完成修复,当已经合格的桩,出现混凝土停止浇灌事故后,清除已浇混凝土比较困难时,可以采用此方法。补桩法,如果在施工过程中发现钻孔桩距过大时,不能够承受上部荷载时,可以采用此方法进行补救。钻孔补强法,当基础混凝土发生严重离散和松动时,或者桩底沉渣过厚时,可以采用高压注浆的方式来进行解决,如果存在蜂窝的情况,就可以通过钻机钻到质量不合理的地方,然后进行高压灌浆。砼成型之后,必须要加强砼的养护工作。只有这样才可以防止砼产生干缩变形从而引起预埋件形成空鼓。在摘膜时我们一定要先摘去砼周围的模板,然后放松螺栓固定的装置,之后再轻轻击打预埋件处模板,当模板松弛之后再将其拆除,防止在拆除模板时候砼的强度过于低而破坏了筋和砼的握裹力,通过这样的方法,可以保证预埋件在施工中的质量问题。

4 结束语

随着我国建筑工程预埋件施工技术的不断发展和完善,在预埋件的施工中的所需要面对的施工问题也越来越多,越来越复杂,需要的是我们施工人员在今后的施工中不断的将一些施工运用的方式方法不断完善和创新,在实践中创新和完善出更多可行性施工方案。为我国建筑工程预埋件施工事业做出更多贡献。

参考文献

第5篇

关键词:建筑幕墙 ;防火设计;防雷设计 ; 施工要求

Abstract: in recent years, with the rapid development of China economy and the continuous improvement of people's living standard, housing problem has become one of the most concerned issues, because the city land area is finite, so a large number of high-rise buildings and even is a high-rise building will emerge as the times require, plus the construction requirements of the continuous improvement, building curtain wall is more and more by the vast number of developers and designers pay more and more attention, because the curtain wall material and the role of the particularity, it also has become now the construction of a trend and the trend of development, almost became an essential part of high-rise building. Next, this article aims at the building curtain wall, lightning protection design and construction requirements and other aspects of some specific explanation.

Key words: building curtain wall; fire protection design; design; construction requirements

TU2

建筑幕墙的防火设计

建筑幕墙的防火设计主要就是通过对幕墙材料进行严格要求,提高建筑幕墙的防火能力,降低火灾发生的风险。近些年,随着建筑幕墙数量的不断增多,它们发生的问题也越来越多,尤其是这几年,有关在建或是已经交付使用的建筑幕墙发生了多次火灾,这也引起了社会以及有关部门的重视。建筑幕墙的防火设计具体要做到以下几点:

第一,明确防火设计责任,建筑幕墙的防火设计主要由工程设计范围负责,设计单位在进行设计时候要充分考虑幕墙防火结构设计的合理性和安全性,并对建筑幕墙的相关施工过程中的注意事项给予明确说明。而且设计单位必须具有专业的设计资质,严格按照有关的规定和规范进行防火工程的设计,保证防火设计达到相关的质量标准。

第二,设计防火幕墙时候应对幕墙的设置、层数、长度以及面积和防火分区等方面都作出具体明确的说明和要求,并且保证所有的设计都符合相关的质量规范和要求。

第三,设计建筑幕墙的时候一定要注意幕墙分格的要求,在设计幕墙分格是要注意杆件和墙、梁、柱各位置的一致,避免他么出现交叉部门。

第四,在设计建筑幕墙时,还要注意幕墙与每层楼板和隔墙处之间的缝隙,对所有缝隙都应采取不燃烧材料来进行填充,保证楼板和隔墙处能够形成水平或是垂直的防火带。

第五,设计中对于所有的建筑幕墙的防火材料和保温材料均要采用不燃烧的材料,对于材料的品种、材质、耐火等级、燃烧性能等都有着很严格的标准,而且在建筑幕墙表面要进行必要的防潮措施。

建筑幕墙的防火施工要求

第一,建筑单位必须严格根据审核合格的设计方案或者是设计图纸来进行施工,而且在施工过程中施工单位不得私自改动施工方案。

第二,在对于防火材料进行安装时,必须要有固定的措施或工具,保证安装材料的稳固性,使得安装材料即不松懈也没有遗漏的部分,如果出现拼缝的地方要确保拼缝处不留缝隙。

第三,施工中所安装的防火材料不能够与建筑幕墙玻璃直接的接触,在防火材料和玻璃之间要用装饰材料覆盖或是隔开。现在施工过程中玻璃防火墙主要运用的防火材料就是防火棉而在搁置防火棉的时候需要用金属板来放置,金属板的厚度一般应该不小于镀锌钢板的厚度。但是对于金属或是石材幕墙的防火层来说必须要采用经过防腐处理而且有一定厚度的耐热钢板来充当,特别注意的是二者均不可采用铝板来充当。最后,对于幕墙四周和主体结构之间的缝隙来说一定要采用防火保温材料全部填塞充实,但是也要注意填塞的时候不可用水泥砂浆等干硬性的材料来进行,而且内外表面还要采用密封胶进行密闭。

第四,施工中对于采用的防火材料有着很严格的要求,所有的防火材料不仅要有产品合格证而且还要有专门部门的材料耐火检验报告才行。

第五,在所有施工技术之后,必不可少的一步就是对于工程的质量进行检验。主要检查的对象由于:检查所有的防火节点和防火隔断的密封是否严实,各层之间的防火隔断是否运用合格的材料进行了填塞以及其他的各项施工是否达到了防火规范的要求。

建筑幕墙的防雷设计

第一,建筑幕墙的防雷设计首先应该详细了解建筑主体的防雷设计装置和幕墙、门窗门洞的防雷装置的引出线应该怎么设计,还要了解建筑幕墙和所有门窗型材的金属导电性能,从而才能根据各部分结构和材料的要求,设计出一个安全、合理的防雷设计方案。

第二,建筑幕墙的防雷设计主要要建成成幕墙自身的一个防雷网,将其与建筑主体结构的防雷体系相连接就可以起到安全的防雷要求,但是幕墙自身的防雷网面积不宜过大,一般要保证在100平方米以下。

第三,对于建筑五的不同防雷设计也有所不同,尤其是对于内部拥有较多重要的敏感电子系统,例如通信设备或者是电子计算机以及其他电子控制系统的建筑来说,要想避免这些设备的屏蔽作用,可以将防雷设计从地面基层(首层)做起,也就是将首层以外的外墙上的建筑幕墙、门窗以及金属栏杆之类的较大金属物都与防雷设计相连接。

建筑幕墙的防雷施工要求

由于建筑幕墙结构和建筑材料的特殊性,所以对于防雷措施有着很高的要求,有了科学的防雷设计之后,还需要注意的就是施工了。

第一,对于建筑幕墙的施工来说,首先就是要了解幕墙的所有内部结构,所有施工人员要详细了解建筑主体的防雷装置和幕墙、门窗洞口的防雷装置引出线,要充分利用幕墙、门窗型材的金属导电特性,这样才能为科学合理施工提供依据。

第二,通过对以前防雷施工经验的总结和归纳,现在建筑幕墙的防雷施工措施是:幕墙位于均压环处的预埋件的锚筋必须与均压环处的梁的纵向钢筋连通,固定在设均压环楼层上的立柱必须与均压环连通,位于均压环处与梁纵筋连通的立柱上的横梁必须与立柱连通。

第三,幕墙立面上,水平方向上位于未设均压环楼层的立柱,必须与固定在设均压环楼层的立柱连通。幕墙顶的防雷可用避雷带或避雷针,由建筑物防雷系统统一考虑。建筑幕墙位于女儿墙外侧时可沿屋顶周边设避雷带,其安装位置略为突出女儿墙顶部;也可用屋顶其他明设金属物作为接闪器;也有直接利用建筑幕墙与女儿墙之间的封顶金属板作接闪器,这时要求金属板板与板之间的搭接长度大于金属板无绝缘覆盖层,金属板与女儿墙内的钢筋连接成电器通路。在女儿墙部位幕墙构架与避雷带装置的连接节点应明露。

上面就是对于建筑幕墙防雷施工措施的一些简单介绍,对于施工来说主要的就是明确建筑幕墙内部的原理结构,再根据实际情况按照有关的规定来一步一步的进行施工,尤其是对于一些连接容易出故障的地方要格外注意,最后施工完成后进行测试和检查即可。

4、结语:对于当前的建筑工程来说,建筑幕墙已经成了高层建筑中不可缺少的一部分,但是随着相关法律法规的不断完善,对于建筑幕墙的施工要求也变的越来越严格,而建筑幕墙要想保证其质量,首先要保证的就是防火和防雷设计和施工的质量,所以这也给工程的承建方来说也增加了更多的施工难度,施工方必须严格按照有关的规定和要求,保障建筑幕墙施工的质量,也促进建筑幕墙施工技术的进一步发展。

参考文献:

第6篇

关键词:责任感;专业知识;组织协调;实践经验

中图分类号: TU761 文献标识码: A 文章编号:

建筑工程所涉及的工种多,接触的人员繁杂,工人素质普遍不高,什么样的人才能胜任现在建筑项目的现场管理呢?结合目前市场要求,优秀的工程项目管理人员,必须具备以下基本素质:

职业道德和责任感

“爱岗敬业、诚实守信、办事公道、服务群众、无私奉献”,这二十个字可作为建筑工程项目管理人员的基本职业道德。基于建筑工程的特点,项目管理人员的职业道德具有一定的纪律性,因为有了纪律性,就可以作为行为规范,因此,项目管理人员的职业道德是一种具有一般约束力的行为标准。没有规矩则不能成方圆,没有规范就没有了秩序,如果工程项目管理人员的规范、标准缺失,不仅会冲击正常的建筑项目建设秩序,使行业乱了分寸,还会影响到建筑行业的健康发展和企业的生存。拥有良好的职业道德,有助于维护和提高企业的信誉,促进企业的发展。而只有有了责任感,才能具有驱动自己勇往直前的不竭动力,才能感到岗位职责的存在,才觉得工作中有许多有意义的事需要自己去做,才能自觉做好分内的事,才能感受到自我存在的价值和意义,才能真正得到大家的信赖和尊重。项目经理犹如封疆大吏,位高权重,如果没有职业道德可言,没有责任心,工作中私人利益至上,或者别有用心,个人能力越强最终给企业带来的损失也越大。作为一个优秀的管理人员,工作中要摒弃个人感情,不管任职哪一行,高尚的职业道德和强烈的责任感是必须具备的基本素质。

专业理论知识

作为项目管理人员,必须吃透项目文件,包括合同条件、图纸文件,必须掌握施工工艺、施工规范,必须懂得工程概预算、招投标知识,必须了解相关法律法规。管理人员不是专家,也不能要求他们面面俱到,但是必须具备一定的本行业知识和技术水平,只有掌握了这些知识,才能及时发现项目中出现的问题,准确提出解决办法,果断决策,不断克服各种困难,最终实现项目目标。

组织管理能力

管理能力包含两个层面,“管”就要积极主动任事,勇于承担责任,不拖延、不推诿,职责所在,不畏困难,勇往直前;“理”就事把事情理顺,千头万绪要理清楚事情轻重缓急、先后顺序,然后落实计划,认真执行。综合来说就是对计划的管理、对质量的管理、对风险的管理、对人员的激励等等。一个项目能够正常运转,管理人员在其中所起的作用很大程度上表现在组织和管理上。建筑工程项目从筹建开始,材料机械、周边环境、施工工艺、管理制度、企业文化以及参建人员素质等都会直接或者间接影响项目的顺利实施,因此,根据项目特点,编制一套管理文件并付诸实施,进行科学的管理,方方面面都不能失控,这不仅是学问,更是一门管理艺术。

协调沟通能力

一个优秀的管理者,要做到下级安心、上级放心、同级热心、内外齐心,必须要有良好的协调沟通能力,只有这样,才能得到大家的支持和积极配合。建筑工程建设项目涉及的范围较广,牵扯到的政府机关单位很多。作为项目管理人员,不仅要组织协调好内部团队关系,与外界各级管理部门及地方关系也要积极沟通,了解他们的想法,建立良好的关系,营造和谐的氛围,减少摩擦,妥善解决各方关系,才能顺利展开工程建设工作。

健康的身体和丰富的实践经验

第7篇

关键词:高强砼 质量控制

概述

混凝土是现代工程结构的主要材料,我国每年混凝土用量约10亿M3,可见混凝土仍将是我国在今后相当长时期的一种重要的工程结构材料,物质是基础,材料是发展,必将对混凝土结构的设计方法、施工技术、试验技术以至维护管理起着决定性的作用。高性能混凝土(highperformanceconcerte,HPC)是近年来混凝土材料发展的一个重要方向,所谓高性能:是指混凝土具有高强度、高耐久性、高流动性等多方面的优越性能。从强度而言,抗压强度大于C50的混凝土即属于高强混凝土,提高混凝土的强度是发展高层建筑、高耸结构、大跨度结构的重要措施。采用高强度混凝土,可以减小截面尺寸,减轻自重,因而可获得较大的经济效益,而且,高强混凝土一般也具有良好的耐久性。高强砼大多用于重要结构,其质量保证对工程结构安全影响重大,稍有不慎,就会出现质量事故,因而高强砼必须要求科学施工和严格控制。例如:新拌砼坍落度经时损失过快,砼拆模后表面裂纹以及高强砼试验检测方法等需要尽快解决。

2.原材料

2.1.水泥。水泥是提供活性,使砼产生强度的胶凝材料,因而高活性的水泥是配制高强砼的必要条件。另外,水泥的品种,细度,可溶盐化学组成化学组成含量以及水泥矿物质组成都对砼的性能,尤其新拌砼工作性产生影响,例如C3A含量增加或水泥细度增大,将增加对高效减水剂的吸附,降低砼的减水率,使坍落度损失增大。

2.2.细骨料。配制高强砼应采用干净的中砂,必须重视砂中含泥量对高强砼性能,尤其是强度性能的影响。现在高强砼一般规定砂的含泥量不大于2.0%,如果砂含泥量能控制在1.5%以下,配制高强砼将会容易的很,因而需专门订立砂子供货合同或在工地对砂增加一次冲洗。另外,细度模数较小的砂会使高强砼更加发粘,应尽量选用细度模数为2.6-3.1的中粗砂。

2.3.粗骨料。石子的级配和粒径对高强砼配制能有很大的影响,用最大粒径31.5mm的石子配制C60泵送砼很困难,最大粒径20.0mm左右的石子最适宜配制高强砼,石子中针片状含量增加和级配的好,会使砼和易性降低。石子中含泥量以及石子本身强度,在配制较高等级的砼时,需要引起重视。

2.4.掺合料。掺合料已是配制高强砼的必须组份,它所起的作用主要是节约水泥用量,降低水化热和提高砼的新拌及硬 化性能。用于配制高强砼的掺合料主要有粉煤灰,硅粉和磨细矿粉等。在配制高强砼时,应优选需水量较低的掺合料。

2.5.外加剂,高效减水剂是配制高强砼的关键成份。目前国内用于配制高强砼主要是萘系高效减水剂,例如:NF、UVFS、FVN等,减水率一般在15%-20%, 为了解决高强砼坍落度损失问题,高效减水剂一般与缓凝剂复配使用。

试配强度和配合比

3.1试配强度。砼的施工配制强度必须超过设计要求的强度标准值以满足强度保证率的需要,标准差确定时,可按高一级强度等级的强度标准值作为施工配制强度。计算出的施工配制强度,首先用于配合比计算,然而更重要的是验证施工配合比能否满足砼结构强度保证率的要求。只有试配试验强度平均值达到或超过施工配制强度的砼配合比,才能用作该强度等级的砼施工配合比。

3.2配合比。配制高强砼水泥用量不能过大,试验结果表明,水泥用量增加到一定值,砼的胶凝强度不再提高,甚至反而降低,还会造成水化热过大等不利影响,配制C50-C60砼,水泥用量为420-500kg/m3为宜。掺用掺合料后的胶凝材料总量一般也不超过550kg/m3。

3.3控制水灰比是保证高强砼强度质量的关键,C50-C60砼水灰比可取0.31-0.35。高强砼用水量除因水灰比降低而减少外,主要取决于砼的坍落度及粘性,配制C50-C60泵送砼每m3砼用水量一般控制在175-190kg/m3。砂率控制在35%-42%。采用优质掺合料时,掺合料的用量可适当增加。如用一级粉煤灰,可掺加到15%-20%。

3.4砼粘度增加和坍落度损失问题。

与普通砼相比,高强砼拌合物很重要的特征就是匀质性好,粘性大和坍落度损失快,这主要是采用了高效减水剂和低水灰比的结果。新拌砼粘性大和坍落度损失快,给泵送施工造成很大困难,影响了高强砼推广应用和强度的进一步提高,就目前砼材料技术水平来说,要彻底解决高强砼粘性和坍落度损失问题还有一定困难。现在一般采用一些综合措施使高强砼粘性和坍落度损失在一定程度上得以改善。首先要选用质量好的水泥、砂、石子和掺合料等原材料,由此在达到同样强度要求条件下,每m3砼能增加5kg用水量,这可以使高强砼的粘性明显降低,坍落度损失也会改善。高效减水剂中复配缓凝剂是当前工程实践中解决坍度损失的主要措施。因为高强砼掺用缓凝组分后,适当抑制高强砼各组分的表面物化活性和化学反应活性,从而降低砼坍落度损失。国内市场供应的木钙,糖柠檬酸等都可选作缓凝组分,但必须针对每种水泥和具体的砼拌合物选配缓凝剂和确定掺量。

适当增加高效减水剂用量和采用滞水后掺法也是施工过程中很实用的一种解决高强砼经时损失的方法。当砂子质量较好时,适当增大砂率和引入少量微气泡,也将有利于降低高强砼的粘滞性,改善可泵性。另外,复配适当保水,保塑组分或高效减水剂合成工艺中采用新措施 都将会在某种程度上使高强砼粘性和坍落度损失速度降低,这还有待进一步研究。

高强砼施工时,须注意防止为单纯降低粘性和增加落度以满足泵送要求,而中途额外加水,使水灰比增大。

养护

高强砼的养护问题必须引起重视,早期要做好保温、保水养护,不得遗漏。高强砼与普通砼不同,一方面,水灰比低,用水量少,早期水化反应用水相对较大,因而很少有多余的水分,任何一点失水都会使砼强度发展受到影响,而且砼表面也会因失水发生干缩裂纹,另一方面,高强砼水泥用量大,水泥活性高,反应速度快,水化热高,体积稍大的砼结构其中心部位水化放热高峰期的温度可达90℃左面,因此高强砼表面保温养护非常重要,表面与中心部位温差以不大于30℃为宜,温差过大就会导致表面温度裂纹。高强砼拆模时间应控制在砼内部温度与外部大气温度接近时为宜,并且拆模后要迅速保水养护7-14d。防止高强砼表面裂纹,对保持高强砼的耐久性能有重要意义。

试验条件及方法

高强砼作为一种新材料,其流动性能,力学性能,体积变形性能以及耐久性能等有不同于普通砼的特征,现在各国试验高强性能的测试方法大多仍采用原来基于中低强度的普通砼建立起来的标准,规范。然而,许多试验研究结果表明,现有的砼性能试验方法在用于高强砼时存在着偏差。例如:用坍落度筒测得的高强砼坍落度就不足以评价高强砼拌合物的可泵性,因为它没有反应出砼的粘滞性。现在试验研究和工程技术人员主要是依靠感官结合坍落度值评定高强砼的工作性。抗压强度是评价砼结构质量的主要指标,抗压强度测定值受试件成型养护条件,试件尺寸,试验机刚度,加荷速度等诸多因素影响,高强砼试压时应采用刚度更高的试验机,抗压试件的养护要更加严格,并应争取模拟结构砼的成型和养护条件。高强砼采用100mm×100mm×100mm立方体试模成型试件比较好。

质量控制和质量评定

6.1质量控制。高强砼必须有严格和完善的质量控制才能保证工程质量,要针对工程专门建立高强砼施工组织班子,明确岗位职责和岗位人员,每个工序都必须安排责任心强的技术人员把关,制定的施工技术方案要科学,严格和具体明确。原材料的品质指标必须分批检验和严格控制。各种计量器具要事先率定,保证配比计量误差控制在允许范围之内,应尽量采用自动化计量,减少人工计量。除特殊要求的自密实砼外,高强砼浇注时应加强振捣,否则不仅影响强度,甚至会出现蜂窝麻面。

另外,高强砼施工时,要建立起一套完善和科学的砼施工质量试验检测体系。试验检测控制点要布置充足无遗漏,方法要准确,能及时反馈质量信息。例如:对新拌砼在出口要测定每盘的坍落度,每一台班测一次湿密度,以便及时掌握砼质量波动情况,一旦砼坍落度明显增大或出现泌水,应迅速追查原因或将该批砼作废。对砼抗强度试件,包括同条件养护试件,应增加制作的组数和养护的龄期,以便及早和更准确了解砼质量情况。

6.2质量评定。对高强砼,目前仍然参照普通砼评定验收办法,即按在浇注时留取和按标准养护试件的抗压强度值进行评定验收。结构强度以现场水养护的试件抗压强度评定。

第8篇

关键词:建筑施工;安全管理;现状;优化措施

建筑施工中的安全管理涉及到许多方面,从纵向上来说,涉及到建筑施工的前期准备、中期施工和后期竣工审核;从横向上来说,环境、人员、材料、机械、设备等都涉及到安全管理。随着建筑工程数量的增加、人们对于质量安全的重视程度的提升无一不对建筑施工安全管理提出新的要求。

1建筑施工安全管理的现状

1.1安全制度形同虚设

通常情况下,建筑施工中安全管理措施最直接的表现在于每个建筑施工工地都会设立安全标语。如“进入工地请戴安全帽”、“安全是生产的百年大计”等。尽管如此,建筑工人仍会忘记或是不重视不戴安全帽的制度,而制度要求升降机是不允许不搭载工人的,但一些建筑工人为了节约时间直接搭乘升降机。当前一些安全事故都是由于建筑施工中忽视制度,置制度于不管所导致的。另外一个原因在于当前建筑施工人员的职业素质所致,通常情况下,建筑施工人员依靠经验展开工作,在工程建设中容易疏忽大意。当前建筑施工安全管理中最重要的是对人员安全观念的管理。

1.2对小型安全事故管理控制能力不足

目前,建筑施工安全管理过程中,对于重大安全事故的把关和管理控制较为严格。但是忽视小型的安全事故监控管理,未能防微杜渐,全面贯彻安全管理。分析当前建筑施工安全事故的致因机制可知,绝大多数的安全事故都是可避免的,但由于建筑施工队伍中缺少必要的应急管理领导队伍和人员结构不足,导致事故发生后未能及时掌握事态发展并提出解决措施。如南方某建筑施工队伍,工人在垒砖的时候未能考虑到砖头的重心倾斜问题,导致砖头频繁出现掉落现象,但是该建筑队伍从未重视此现象,并提出相应的对策。最后当砖头垒到一人高时倒塌,造成较大的经济损失。

1.3安全管理的力度和强度不够

在建筑施工过程中,需要一套系统的、科学的管理制度,要求包含质量控制管理、工程进度管理还有安全生产管理。还要求各个管理制度能够相互衔接,在建筑施工的各个环节中发挥作用。但事实上,当前不论是安全管理还是其他形式内容的管理的力度和强度都未能涉及到建筑工程的各个环节。例如,某建筑施工工程中对于前期投招标的工作未能展开安全管理,对于工程进度不能进行有效的规划,导致在工程后期为了赶进度,安全事故频出,使该工程队造成大量的经济损失。

2建筑施工安全管理的优化措施

2.1落实建筑施工安全管理制度

落实建筑施工安全管理制度需要从两个方面入手:①要求对现有的建筑工人展开安全培训,提高其对安全管理的认知;②要求能够制定同安全管理制度相适应的配套制度,如激励制度、招聘制度等。通过招收具有较高安全意识的施工人员并且利用激励的制度,让所有的建筑施工人员能够自觉加入到建筑施工安全管理工作中。如某建筑施工队伍,在极端天气时,对施工人员展开为期三天的安全培训,并在课程结束后展开考试,成绩优异者可以获得奖金;另外该建筑队伍还通过奖惩制度,让施工人员之间能够互相监督管理,提高人员对建筑施工安全管理制度的践行程度。

2.2加大对施工安全事故的监督管理

当前建筑施工安全事故呈现出的“小型事故不管,大型事故管不了”的问题。可以通过设立专业的安全管理队伍和领导班子,提高对各种安全事故的管理。一方面建筑施工队伍要寻找一批熟悉安全生产和建筑施工的人员组建监督队伍,定时定期对建筑施工过程进行巡检;另一方面要求建筑施工队伍能够制定突发事故应急预案,如沿海地区在夏季多台风、暴雨天气,施工队伍及时注意关注天气变化,并制定安全管理机制,在极端天气来临前加强对材料、机械等的巡查,并加强安全防护工作等。

2.3增加施工安全管理的力度和强度

增加建筑施工安全管理的力度和强度要求能够调动整个建筑施工队伍参与到安全管理工作中。同时要求能够从横向和纵向施工建筑中都将安全管理置于首位。一方面是工程施工前期要求能够重视安全管理,不论是前期的勘察还是设计、投招标工作都要涉及到工程的安全问题;另一方面是要求能够加强对安全管理的资金投入,加强资金支持,让安全管理能够更加具有深度和广度。所以说,增加建筑施工安全管理的力度和强度主要是从统筹全局的角度上来说的,把握住生产管理的全局性至关重要。

3结束语

综上所述,当前建筑施工安全管理的措施整体上是从制度上规范它、观念意识上加强它。但是事实上,由于建筑施工具有突发性,也会受到环境天气的影响,同时一些安全标语形同虚设,未能真正提升施工人员对于安全施工的重视,导致安全事故频发。因而加强对突发安全事故的管理措施具有重要意义。当前从制定应急预案、组建应急队伍,加强领导落实监督,将各个制度、观念思想落实到实处是优化安全管理的重要手段。

作者:杨涛 单位:新疆铁龙建筑工程有限责任公司

参考文献:

[1]潘炎棠.关于建筑施工安全管理的几个问题[J].建筑安全,2011,(2):25-26.

[2]萧子越.我国建筑施工安全管理现状及与发达国家建筑施工安全管理的差异分析[A].